Case Studies
Projects delivered during my 10 years in the Methods office at Etchart Construction, as BIM and methods supervisor.
These 6 case studies are part of over 60 projects followed through the execution phase at Etchart Construction, alongside many design-phase assignments. Further references are available on request.












CONTACT@CRUT3DMETHODS.CO.UK
+44 1234 978359
© 2026 Crut3D Methods Ltd. All rights reserved.


Crut3D Methods Ltd · Company No. 17337190 · Registered in England and Wales · 9 Goldington Road, Bedford, MK40 3JY - ICO registration: ZC205948
