Case Studies

Projects delivered during my 10 years in the Methods office at Etchart Construction, as BIM and methods supervisor.

These 6 case studies are part of over 60 projects followed through the execution phase at Etchart Construction, alongside many design-phase assignments. Further references are available on request.

Aerial view of Saint-Pée-sur-Nivelle wastewater treatment plant with circular concrete basins
Aerial view of Saint-Pée-sur-Nivelle wastewater treatment plant with circular concrete basins
Aerial view of the AGUR head office under construction in Anglet with tower crane in place
Aerial view of the AGUR head office under construction in Anglet with tower crane in place
Aerial view of Collège Belcier in Bordeaux showing completed roofing and school buildings
Aerial view of Collège Belcier in Bordeaux showing completed roofing and school buildings
Completed cultural centre in Saint-Jean-de-Luz with white rendered facade and glazed upper floor
Completed cultural centre in Saint-Jean-de-Luz with white rendered facade and glazed upper floor
Elevation drawing of the Domofrance Bayonne housing refurbishment showing facade phasing
Elevation drawing of the Domofrance Bayonne housing refurbishment showing facade phasing
3D visualisation of the Gascogne MAP7 industrial plant in Mimizan with production halls and yard
3D visualisation of the Gascogne MAP7 industrial plant in Mimizan with production halls and yard